eight years
Building the Bridge It took eight years, five major contractors and the relentless labour of 432 construction workers each day to build Tower Bridge under the watchful eye of Sir John Wolfe Barry.

When did they finish building Tower Bridge?

1894

Tower Bridge
Construction start 21 June 1886
Construction end 1894
Opened 30 June 1894
Location

What was the purpose of the Tower Bridge?

Built between 1886 and 1894, the Tower Bridge was designed to ease road traffic while preserving access to a main stretch of the River Thames. A traditional fixed bridge at street level could not be built because it would cut off access for many tall ships.

How much did Tower Bridge cost?

Some 50 designs were put forward, and in 1884, architect Horace Jones’s now iconic design was chosen. Construction cost £1,184,000 and took 432 men eight years to build.

Is London Bridge and Tower Bridge the same?

Tower Bridge is London’s defining landmark. The sole river crossing in London since the Roman times, the latter was simply called ‘London Bridge’, but its history has been anything but simple. London Bridge as we know it was opened to traffic in 1973, being then only 47 years old.

Why is Tower Bridge painted blue?

When Tower Bridge was given a fresh lick of paint in 2009, he investigated the bridge’s earlier colour schemes and found that, when it was originally built in 1886, it was a fetching shade of ‘mid-greenish blue’. ‘The bridge was painted blue, white and red in preparation for the Queen’s Silver Jubilee’ explains Baty.

Why is Tower Bridge so famous?

Tower Bridge is famous because it’s London’s most striking bridge thanks to its Neo-Gothic architecture and lifting central sections. When it opened, it was the most sophisticated bascule bridge in the world.

Why is Tower Bridge painted blue and white?

Why is Tower Bridge popular?

Why is Tower Bridge Famous? Tower Bridge is famous because it’s London’s most striking bridge thanks to its Neo-Gothic architecture and lifting central sections. When it opened, it was the most sophisticated bascule bridge in the world.

Did London Bridge actually fall down?

Despite all of its structural failures, the London Bridge survived for 600 years and never actually “fell down” as the nursery rhyme implies. When it was finally demolished in 1831, it was only because it was more cost-effective to replace it rather than repair it.

Why do people confuse London Bridge with Tower Bridge?

Things you probably didn’t know about Tower Bridge Drawbridges require ropes or chains to pull up the road, but Tower Bridge’s roads are too heavy to be opened like this. Instead it is a bascule bridge, which means the roads (bascules) move like two giant seesaws and pivot to open and close the bridge.

What is the difference between London Bridge and Tower Bridge?

When and why was the Tower Bridge made?

Built between 1886 and 1894 , the Tower Bridge was designed to ease road traffic while preserving access to a main stretch of the River Thames. A traditional fixed bridge at street level could not be built because it would cut off access for many tall ships.

How tall is Tower Bridge?

Tower Bridge is about 213 feet tall

How long is Tower Bridge?

Constructed in 1894, Tower Bridge is a suspension bridge and a world heritage site measuring 244m (801 feet) long and 65m (264 feet) high and provides a roadway across the Thames for over 40,000 people both on foot and wheels. It’s free to walk across the bridge and to witness its opening and closing,…

Where is the Tower Bridge located?

The Tower Bridge is located in above the River Thames, London. On June 30th, 1894, the Tower bridge was opened by King Edward VII.